FICSIT Global Resource Summary
Raw Materials & Ores Required
Surplus & By-Product Origins
Total Machine Footprint
Fluid Recycling Loops
🏢 FICSIT Multi-Floor Layout Plan
Optimal Production Line Tree
Tip: Swap alternate recipes directly on any node below to instantly optimize downstream machines.
Factory Logistic Flowchart
Visualising item flow rates and conveyor belt / pipeline requirements between production blocks. Connection lines are color-coded and scaled by capacity (■ 1 belt/pipe, ■ 2 belts/pipes, ■ 3-4 belts/pipes, ■ 5+ belts/pipes). Fluids run via Mk.1 (300 m³/min) & Mk.2 (600 m³/min) Pipelines. Mouseover blocks for full machine specs or lines for flow details.